×

subordinate phase meaning in Chinese

第二阶段

Examples

  1. Author also stressly calculates plane deformations of skew girder bridge due to the actions of the subordinate phase dead load , temperature changes , shrinkage and creep of concrete and vehicle loads in different places , and thereby analyses the characteristics of plane movement for the skew girder bridge
    作者还着重对斜梁桥的二期恒载、混凝土收缩、徐变、温度变化和不同位置汽车荷载作用下的平面变形进行计算分析,由此分析斜梁桥的爬移特点。
  2. Secondly author calculates and analyses normal stress and shear stress of the girder for a assembling post - tensioned concrete skew girder bridge with a span of 40 m due to the actions of the dead load , temperature changes , shrinkage and creep of concrete and live loads , and calculates and analyses normal stress and shear stress of diaphragms due to the actions of the subordinate phase dead load , temperature changes , shrinkage and creep of concrete and live loads
    其次重点对跨径为40m标准设计的装配式后张预应力混凝土斜梁桥在恒载、温度变化、混凝土收缩和徐变、活载作用下主梁的正应力、竖向变形和恒载、活载作用下主梁的剪应力进行计算分析。计算分析横隔板在二期恒载、温度变化、混凝土收缩、活载作用下的正应力、剪应力。

Related Words

  1. subordinated
  2. subordinates
  3. subordinate
  4. subordinated notes
  5. subordinate frame
  6. subordinate function
  7. subordinate organization
  8. subordinated service
  9. subordinate line
  10. subordinate category
  11. subordinate organization
  12. subordinate partition of unity
  13. subordinate phase of production
  14. subordinate predication
PC Version

Copyright © 2018 WordTech Co.