subordinate phase meaning in Chinese
第二阶段
Examples
- Author also stressly calculates plane deformations of skew girder bridge due to the actions of the subordinate phase dead load , temperature changes , shrinkage and creep of concrete and vehicle loads in different places , and thereby analyses the characteristics of plane movement for the skew girder bridge
作者还着重对斜梁桥的二期恒载、混凝土收缩、徐变、温度变化和不同位置汽车荷载作用下的平面变形进行计算分析,由此分析斜梁桥的爬移特点。 - Secondly author calculates and analyses normal stress and shear stress of the girder for a assembling post - tensioned concrete skew girder bridge with a span of 40 m due to the actions of the dead load , temperature changes , shrinkage and creep of concrete and live loads , and calculates and analyses normal stress and shear stress of diaphragms due to the actions of the subordinate phase dead load , temperature changes , shrinkage and creep of concrete and live loads
其次重点对跨径为40m标准设计的装配式后张预应力混凝土斜梁桥在恒载、温度变化、混凝土收缩和徐变、活载作用下主梁的正应力、竖向变形和恒载、活载作用下主梁的剪应力进行计算分析。计算分析横隔板在二期恒载、温度变化、混凝土收缩、活载作用下的正应力、剪应力。